![Century 925 Installation, Operation, Maintenance, Parts Download Page 108](http://html.mh-extra.com/html/century/925/925_installation-operation-maintenance-parts_2583157108.webp)
Section IV - OPERATING INSTRUCTIONS
WRECKER (cont’d)
IV-2
(c) Adjust engine speed to desired RPM using the Vernier Throttle
Control located on the left hand side of the wrecker body.
DO NOT EXCEED 1500 RPM
NEVER DRIVE TRUCK ON STREET WITH PTO ENGAGED,
THIS CAN CAUSE PUMP FAILURE DUE TO
OVER-SPEED AND OVERHEATING.
4.3 PREPARING TO LOAD VEHICLE (cont’d)
4.4 CABLE PAYOUT
Before operating any control handles, observe the winch cables to
make sure they are free and have sufficient slack to allow the boom to
extend. If not, payout cable by using the Cable "IN/OUT" Controls, or
switch on the Air-Operated Free Spool switch and manually pull
cables out to a sufficient length for boom extension.
4.5 BOOM ELEVATION
Elevate boom to the desired height by use of the Boom "UP/DOWN"
Control. See Figure 4.2.
Section VI - PARTS (cont’d)
VI-34
AIR OPERATED FREE SPOOL CLUTCH
FIGURE 4.2
Summary of Contents for 925
Page 76: ...Section VI PARTS cont d VI 2 BODY ASSEMBLY 925 GSA ...
Page 78: ...FORMULA III WHEEL LIFT ASSEMBLY Section VI PARTS cont d VI 4 ...
Page 80: ...FORMULA III WHEEL LIFT HYDRAULICS Section VI PARTS cont d VI 6 ...
Page 86: ...Section VI PARTS cont d VI 12 925 GSA WRECKER ASSEMBLY ...
Page 88: ...Section VI PARTS cont d VI 14 925 GSA WRECKER BOOM HYDRAULICS ...
Page 98: ...VI 24 Section VI PARTS cont d WINCH ASSEMBLY ...