BIO X6 User Manual v. 1.0
150
11.1.6
Acceptance
The Buyer shall, immediately following each delivery of any Product, inspect the Product to
identify any external damage and to ensure that the delivery is in accordance with the order.
Any defects or deficiencies which are detected in conjunction with delivery shall immediately
be reported in writing to CELLINK.
When a Product is unpacked, and in any event before the Product has been used by the
Buyer, the Buyer shall perform a full inspection of the Product where such was not possible
on receipt of the Product in question. The obligation to report any defects to CELLINK as set
out in the section below shall apply in such context.
At the request of CELLINK, the Buyer shall make defective goods available to CELLINK for
inspection and control.
If the Buyer does not report defects or deficiencies in Products delivered within the time limits
set out above, the Buyer shall have no right to make any claims against CELLINK regarding
the default or defect.
11.1.7
Liability for defects
CELLINK shall remedy any defect in Products delivered, resulting from faulty design,
specification, materials, or workmanship attributable to CELLINK in accordance with the
provisions of Section 5.3
CELLINK is only liable for defects that appear under the intended and proper use of the
Products, included printing using CELLINK’s bioink only. Thus, the liability does not cover
defects caused by faulty maintenance, handling or incorrect storage by the Buyer, alterations
of the Products carried out without CELLINK’s prior written consent, or normal wear and tear
and deterioration.
In order to enable the Buyer to bioprint, the Buyer may insert a USB to upload an .stl file to
the BIO X6. CELLINK shall not be liable for any damage or loss caused by the BIO X6 on
any other software contained on the USB. CELLINK shall neither be liable to remedy any
defects to the BIO X6 caused by faulty or corrupt software provided by the Buyer.
CELLINK’s liability is limited to defects which appear within 12 months from the date when
the Products were delivered.
The Buyer shall notify CELLINK in writing of a defect without undue delay after the defect
has appeared, and in no case later than two (2) weeks after the expiry of the liability periods
as set out above. The notice shall contain a description of how the defect manifests itself. If
the Buyer fails to notify CELLINK in writing within the above time limits, the Buyer forfeits its
right to make any claim in respect of the defect. If there is reason to believe that the defect
Summary of Contents for BIO X6
Page 1: ...BIO X6 User Manual v 1 0 1 BIO X6 User Manual...
Page 8: ...BIO X6 User Manual v 1 0 8 01 Safety...
Page 14: ...BIO X6 User Manual v 1 0 14 02 Specifications...
Page 19: ...BIO X6 User Manual v 1 0 19 03 Getting started...
Page 29: ...BIO X6 User Manual v 1 0 29 04 Bioprinting...
Page 48: ...BIO X6 User Manual v 1 0 48 Figure 22 Custom well plate option...
Page 68: ...BIO X6 User Manual v 1 0 68 Figure 42 Manual calibration glass slide...
Page 94: ...BIO X6 User Manual v 1 0 94 05 Gcode Editor...
Page 104: ...BIO X6 User Manual v 1 0 104 Figure 77 Error message Command not supported...
Page 105: ...BIO X6 User Manual v 1 0 105 06 Draw Print...
Page 117: ...BIO X6 User Manual v 1 0 117 07 Shape Generator...
Page 122: ...BIO X6 User Manual v 1 0 122 08 Print report...
Page 126: ...BIO X6 User Manual v 1 0 126 Figure 97 Protocol setup continued...
Page 130: ...BIO X6 User Manual v 1 0 130 09 Coaxial printing...
Page 134: ...BIO X6 User Manual v 1 0 134 10 Maintenance...
Page 146: ...BIO X6 User Manual v 1 0 146 11 Terms and conditions...
Page 166: ...BIO X6 User Manual v 1 0 166 12 Printhead manuals...
Page 175: ...BIO X6 User Manual v 1 0 175...
Page 176: ...BIO X6 User Manual v 1 0 176 Create the future of medicine...