![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 59](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710059.webp)
59
Step 13: Attach Tunnel Assembly to Fort
Part 2
B:
Attach Tunnel Assembly to the posts, (2602) Upper Jamb and (2774) Upright
through the connector tab
holes
with 4 (S10) #8 x 1” Pan Screws per end. (fig. 13.4 and 13.5)
C:
Attach Tunnel Assembly to (9089) Upper Tunnel Insert with 4 (S10) #8 x 1” Pan Screws. (fig. 13.4 and
13.6)
D:
Attach Tunnel Assembly to each (9088) Tunnel Side Joist with 6 (S10) #8 x 1” Pan Screws per side. (fig.
13.4 and 13.7)
Hardware
32 x
#8 x 1” Pan Screw
S10
9088
9089
9089
6 per
side
S10
4 per
end
S10
S10
Connector
Tabs
Fig. 13.4
Fig. 13.5
Fig. 13.6
Fig. 13.7
Post
Post
2774
2602