![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 58](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710058.webp)
58
Step 13: Attach Tunnel Assembly to Fort
Part 1
A:
From inside the Large Fort slide the Tunnel Assembly through the opening onto the Tunnel Floor Assembly
so it sits tight to the (9089) Upper Tunnel Insert on the Small Fort, both posts, (2774) Upright, (2602) Upper
Jamb and the tunnel floor boards. (fig. 13.1, 13.2 and 13.3)
Tunnel Floor
Assembly
Small Fort
Large Fort
Fig. 13.1
Tunnel Floor
Assembly
Post
Post
2602
2774
9089
Fig. 13.2
Fig. 13.3
Tight
Tight
Large Fort