![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 36](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710036.webp)
36
It is important to assemble the frame on a flat, smooth surface.
B:
Place the Front/Back Wall with the diagonal supports from Step1 Part 3 between a Front/Back Wall without
the diagonal supports and the Swing Wall without the (2778) SW Ground MODs, noticing the wall orientations.
The tops and bottoms of the walls should be flush. Make sure the walls are square then using the pilot holes as
a guide pre-drill with a 3/16” drill bit and fasten the Front/Back Wall without diagonal supports to Front/Back Wall
with diagonal supports and Front/Back Wall with diagonal support to the Swing Wall with 4 (WL5) 1/4 x 2-1/2”
Wafer Lags per side. (fig. 4.2)
Fig. 4.2
Hardware
WL5
Notice Front/Back
Wall without diagonal
supports overlaps
Front/Back Wall with
diagonal supports
Notice Front/Back Wall
overlaps Swing Wall
Front/Back Wall
without diagonal
supports
Swing Wall
Notice slats
to the inside
8 x
1/4 x 2-1/2” Wafer Lag
Step 4: Large Fort Frame Assembly
Part 2
Front/Back Wall
with diagonal
supports
WL5
WL5