![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 37](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710037.webp)
37
8 x
#12 x2” Pan Screw
2 x
Floor Joist 1-1/4 x 3 x 40-3/4”
Wood Parts
Hardware
2608
2677
Tight
(both sides)
Fig. 4.4
Front/Back
Wall
Swing Wall
2677
2608
2608
2608
Flush
x 4 per
board
End Wall
2769
2769
2769
C:
With at least two helpers lift the two wall assemblies so the panels meet and are tight together as shown in
fig. 4.3.
D:
Make sure the assembly is square then on the inside of the assembly, tight to the (2769) Panel BT Frame on
the End Wall and flush to the bottom of the panels attach 1 (2608) Floor Joist to (2677) Narrow Panel and each
(2769) Panel BT Frame on the Front/Back and Swing Walls with 4 (S7) #12 x 2” Pan Screws per board. (fig. 4.3
and 4.4)
Fig. 4.3
2769
S7
S7
Step 4: Large Fort Frame Assembly
Part 3