![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 129](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710129.webp)
129
Hardware
6 x
#8 x 1-3/8” Wood Screw
2 x
#8 x 2-1/2” Wood Screw
A:
With 2 people on the ground and at least 1 person in the fort, lift Small Roof Assembly up and over the Back
side of the fort. Guide the Small Roof Assembly onto the fort so it slides under the Mid Roof Support Assembly
and the (2788) Mid Roof Supports sit tight to the siding on the Small Roof Assembly. The front of the Small Roof
Assembly should be flush to the front of each (2759) Roof End. (fig. 54.1 and 54.2)
B:
Attach Small Roof Assembly to Mid Roof Support Assembly from inside with 3 (S20) #8 x 1-3/8” Wood
Screws per side. Screws to go into (2788) Mid Roof Supports. (fig. 54.1)
C:
Measure 2-1/4” in from Roof Ends and attach Small Roof Assembly to the (2759) Roof End with 1 (S3) #8 x
2-1/2” Wood Screw per side. (fig. 54.2 and 54.3)
x 3 per
side
Tight
Small Roof
Assembly
Step 54: Attach Small Roof Assembly to Fort
Fig. 54.2
Fig. 54.1
2788
Mid Roof Support Assembly
2759
Small Roof
Assembly
Fig. 54.3
S3
Flush
S3
2¼”
2759
Flush
S20
S20
Mid Roof
Support
Assembly
2759
S3
2759
S3