![Cedar Summit Paramount F25040 Installation And Operating Instructions Manual Download Page 121](http://html1.mh-extra.com/html/cedar-summit/paramount-f25040/paramount-f25040_installation-and-operating-instructions-manual_2578710121.webp)
121
Fig. 49.2
A:
On the Back Wall of the Large Fort measure 21-5/8” from (2759) Roof End and 1-1/4” down from the top of the
panel, pre-drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the
top of the panel attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8 x 2-1/2”
Wood Screws. (fig. 49.1 and 49.2)
B:
On the Front Wall of the Large Fort measure 21-5/8” from (2759) Roof End and 1-1/4” down from the top of the
panel, pre-drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the top
of the panel and attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8 x 2-1/2”
Wood Screws. (fig. 49.1 and 49.3)
Step 49: Attach Mid Roof Ends
Flush
Flush
Back
Fig. 49.3
2677
2759
Fig. 49.1
End Wall
2684
2684
2677
2677
2684
2759
Flush
Flush
Front
Hardware
2 x
Mid Roof End 1-1/4 x 4-7/8 x 7”
Wood Parts
2684
2 x
#8 x 2-1/2” Wood Screw
2 x
#8 x 3” Wood Screw
S3
S4
S3
S3
S4
S4
2677
2618
2618
2684
21-5/8”
21-5/8”
Front Wall
Back Wall