L:
Pull Tunnel Assembly tight to (511) Tunnel Post then attach with 4 (S10) #8 x 1” Pan Screws. (fig. 51.9)
M:
Attach top of Tunnel Assembly to bottom of (510) Tunnel Right End with 4 (S10) #8 x 1” Pan Screws. (fig.
51.10)
Step 51: Attach Tunnel Assembly to Fort
Part 5
8 x
#8 x 1” Pan Screw
S10
Hardware
Fig. 51.9
Fig. 51.10
511
510
511
510
Tunnel
Assembly
S10
S10
Tunnel
Assembly
132