
Step 41: A Frame Floor Assembly
A:
Have a helper hold up the A Frame MK Wall and A Frame Access Wall then flush to the ends of both (391)
A Frame Floor Support and tight to the posts attach 2 (410) Floors to each side of the assembly with 4 (S20)
#8 x 1-3/8” Wood Screws per board. (fig. 41.1 and 41.2)
Wood Parts
4 x
Floor FSC 1 x 5 x 21”
410
Hardware
16 x
#8 x 1-3/8” Wood Screw
Fig. 41.1
Flush
410
A Frame
Access
Wall
A Frame
MK Wall
Fig. 41.2
Flush
and tight
391
S20
S20
x 4 per
board
Tight
Tight -
No Gap
Tight -
No Gap
A Frame
Access
Wall
A Frame
MK Wall
113