SCALE:1:1
SIZE DWG. NO.
A
REV.
WEIGHT:
Step 49: Connect A Frame to Fort
Part 2
D:
Attach (492) Tunnel Joist flush to the top of (490) Front Tunnel Support and (491) Back Tunnel Support with
2 (S4) #8 x 3” Wood Screws per side using the pilot holes as a guide. (fig 49.4 and 49.5)
Fig. 49.4
Fig. 49.5
S4
492
Pilot Holes
Flush
490
Hardware
4 x #8 x 3” Wood Screw
S4
Wood Parts
1 x
Tunnel Joist FSC 2 x 4 x 18-7/16”
492
Flush
Main Fort
A Frame
S4
491
125