3
is governed by the type of soil and climatic conditions. The
slab must not be in contact with any part of the building
wall or foundation. The space between the slab and building
wall prevents the possibility of transmitting vibration to the
building. The dimensions of the slab or roof mount should
be checked and verified before the equipment arrives.
INSTALLATION ONTO CURB — Correct placement of
the unit onto the curb is important to operating performance.
Refer to product submittal drawings to assure proper duct
opening alignment.
CAUTION
Do not slide unit into position when it is sitting on the curb.
Curb gasketing material may be damaged and leaks may
result.
Fig. 2 — Rigging Small and Large Units
SHACKLE WITH
1 1/4" PIN MINIMUM
(BOTH SIDES)
FIXED
CABLE
FIXED
SPREADER
BAR
SPREADER
BAR
FIXED
ROLLING
BLOCK
20' CABLE THROUGH
ROLLING BLOCK
HOOK
LOOP CHAIN
THROUGH RIGGING POINT
2" X 2" X 3/16"
SQUARE TUBING
RIGGING POINT
WELDED TUBING
CABINET FRAME
FORMED
GALVANIZED
CABINET
FRAME
ADJUST CABLE LENGTH TO LIFT POINTS
AS NECESSARY,BASED ON UNIT CENTER
OF GRAVITY
SEE DETAIL "A"
(TYP ON TUBING FRAMES)
DETAIL "C"
DETAIL "A"
HOOK & CHAIN
WELDED FRAME
WELDED
FRAME
LIFTING POINTS ON WELDED FRAMES
(NUMBER OF LIFTING POINTS MAY VARY)
(BOTH SIDES)
LIFTING POINTS
BOTH SIDES
FIXED
CABLE
WELDED
FRAME
HOOK
DETAIL "B"
HOOK & CHAIN
GALVANIZED FRAME
GALVANIZED FRAME
WITH LIFTING PLATE
LOOP CHAIN
THROUGH
FRAME AND
LIFTING PLATE
HOOK
SEE DETAIL "B"
ADDITIONAL LIFT POINTS
WITH EXTENDED
CONDENSER USED ONLY
TO SUPPORT CONDENSER
SECTION ON BOTH SIDES TO
PREVENT BENDING AT
POINT C DURING LIFTING
POINT C
LIFTING STRAP
FOR LIFTING POINTS
UNDER AIR HANDLER
DETAIL D
DETAIL "D"
STRAP
GALVANIZED FRAME
GALVANIZED FRAME
WITH LIFTING PLATE
1018