
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #48/54
To vacuum the circuit
1. Remove the nitrogen.
2. Start the vacuum pump.
3. Apply "Triple evacuation" process
(refer to refrigeration training module)
4. Stop the vacuum pump.
5. Check if vacuum is complete with vacuumeter.
(refer to refrigeration training module)
Installation Commissioning Unit
vacuum