
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #25/54
Tools requested
1. Cut the hose at the right length with appropriate tool.
2. Put POE oil on the connector on fitting.
3. Widen hose clearance with adapted tool before to insert
double-clic clamp.
4. Insert double-clic clamp on the hose.
Installation Unit
hoses Preparation