
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #16/54
1.
From box inside
, drill 4 holes
∅
5 mm
in the roof through
and through (drill of minimum size 140mm)
2. Countersink with a drill
∅
12,5 mm
the 4 tapping drill holes
realized at the previous step.
RECOMMENDATIONS
Take care not to damage the
∅
5 mm drilling of
the box external skin.
3.
From box outside
, countersink with a circular slitting saw
∅
22 mm
.
RECOMMENDATIONS
Take care not to damage the
∅
12,5 mm drilling
of the box internal skin.
Installation Box
preparation Mushrooms Preparation