
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #11/54
1. Present the drilling template – not supplied (refer to the
bodybuilder drawing)
2. Mark out fixing and electrical harness and hoses holes.
3. Drill the fixing holes
- drill
∅
10 mm
4. Drill the electrical harness and hoses hole.
Installation Box
preparation Drilling Nosemount