
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #12/54
NOTE :
- The drilling depends on the evaporator you
have to install.
- Let a
minimum space of 15 cm
between the
box wall and the rear of the evaporator.
1. Mark the fixing holes for the evaporator (refer to the
bodybuilder drawing).
If needed, use the fixing material adapted to reinforcement
done by the bodybuilder.
If you don't have reinforcement, you will have to use
mushrooms (refer to section "Mushrooms" page 16).
Installation Box
preparation Drilling Evaporator