
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #22/54
1. Remove the two side panels.
2. Using the adapted tool, put the evaporator facing the fixing
holes previously drilled.
3. Check the minimum distance between the rear of the
evaporator and the box is correct (refer to the chart p6)
4. Tighten the screws.
Installation Evaporator
installation