
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #18/54
1. Apply silicon on the internal side of the mushroom head.
2. Put mushrooms in holes previously realized in box roof.
3. With a mallet, slightly crush the silicon gasket.
4. Follow silent block installation. Take care to clean silent
block surface for a better sticking/water proof ness.
Installation Box preparation
Mushrooms
Set up