8. COMMISSIONING
Commissioning refers to installation of the electrical panel in the field and
setting the air handling unit application software parameters, as well as all the
operations needed to complete the setup of the devices. The Commissioning
procedure is activated on the screen Ge03, after having fitted the BMS
RS485 card on the controller and established the connection to a personal
computer running the pCO Manager program (see the appendix).
8.1 Loading the configuration
If necessary, load the configuration saved following the software
configuration procedure, on screen Gfd01. Once the parameters have been
loaded, the following operations are possible:
1.
verify correspondence of the I/Os to the AHU design;
2.
set the PID parameters for temperature and humidity control, air quality
and advanced control functions (cascade, enable direct [DEC] and
indirect evaporative cooling [IEC], supply limits, compensation, etc..). See
the “Functions” chapter;
3.
set the auxiliary control loops, if featured;
4.
set the baud rate and serial address for Fieldbus and BMS serial
communication;
5.
calibrate the probes;
6.
manually calibrate the fans, coil actuators, humidifier, and activate
purging.
Note:
see the screens in menus Ga, Gb, Gc, Gfc, Ge, Gg and the “Functions”
chapter.
8.2 Commissioning
Warning
: before performing any operation on the pCO board,
disconnect power to the device by moving the main switch on the electrical
panel to OFF. To configure the parameters using PCO Manager:
Step BMS1
BMS2
A
Manually set the protocol to
Winload in screen Ha24: Serial
BMS2-->Winload;
B
Disconnect any BMS cards other than
RS485 (e.g. LON);
C
Connect the RS485BMS card;
D
Activate the Commissioning service on screen Ge03
Config. BMS Ge03
Premere ENTER per
ATTIVARE il servizio
di commissioning
Fig. 8.a
1.
Connect to the computer using the USB/RS485 connector;
CVS
T
D
U
M
O
R0
C1
NO1
NO2
NO3
C1
C4
NO4
NO5
NO6
C4
C7
NO7
C7
NO8
C8
NC8
NO1
2
C1
2
NC1
2
NO1
3
C1
3
NC1
3
C9
NO9
NO1
0
NO1
1
C9
G
G0
U1
U2
U3
GND
+VDC
+V
term
GND
+5 V
REF
U4
GND
U5
GND
VG
VG0
Y1
Y2
Y3
Y4
ID
1
ID
2
ID
3
ID
4
ID
5
ID
6
ID
7
ID8
ID
C
1
U6
U7
U8
GND
ID
9
ID
10
ID
11
ID
12
IDC9
ID
13
H
ID
13
IDC1
3
ID
14
ID
14
H
NO1
4
C1
4
NC1
4
NO1
5
C1
5
NC1
5
C1
6
NO1
6
NO1
7
NO1
8
C1
6
ID
15H
ID
15
IDC1
5
ID
16
ID
16
H
Y5
Y6
ID
17
ID
18
IDC1
7
U9
GND
U1
0
GND
FieldBus card
B M S card
4
3
2
1
O
N
LY FO
R
L
AR
GE
AND
EXT
RA
L
AR
GE
M
O
D
EL
S
Fig. 8.b
2.
Run the commissioning procedure using pCO Manager. See appendix;
3.
At the end of all the operations, stop the Commissioning service.
Config. BMS Ge03
Premere ENTER per
SPEGNERE il servizio
di commissioning
>COMMISSIONING ATTIVO <
>collegarsi porta BMS<
Fig. 8.c
4.
Reconnect the BMS card and restore the connection;
5.
Check that the serial protocol is the same as at the start on Ha24:
-->BMS and Ge01: protocol BMS1: CAREL, Modbus, Lon and Ge02: Protocol
BMS2: CAREL, Modbus, Lon.
Note:
the commissioning service automatically sets the BMS protocol to
“Winload”. Once the procedure has ended, the protocol automatically returns
to “BMS”, allowing reconnection to the supervisor.
8.3 Probe
calibration
In menus Gfb01 to Gfb08, calibrate the probes if necessary and check the
correct reading against a sample probe.
See the parameters table.
8.4 Setting the control parameters
To set the control parameters see the “Software configuration” and “Functions”
chapters. The parameters can be modified from the terminal or a personal
computer using the pCO Manager program. See the appendix.
8.5 Setting the hour counters
On screens Gfa01 to Gfa06 (see the parameters table) a maximum number of
operating hours before maintenance is required can be set for each device.
On exceeding the maintenance hours, a “warning” is signalled on the display
and recorded in the alarm log, without affecting control. Access screens
Gfa01 to Gfa06 again to reset the warning. The purpose is to allow service
personnel to be notified to ensure preventive maintenance.
8.6 Enthalpy
management
Enter the atmospheric pressure for parameter Gfc16 to allow the controller to
correctly calculate the values on the psychrometric chart.
Screen index
Display description
Def
UOM
Min
Max
Gfc16
Enthalpy management
Atmospheric pressure
1090
mbar
600
1100
Tab. 8.a
8.7 I/O
test
Screens He01 to He50 can be used to test the actuators during installation,
see menu Gg01. Modulating fan actuators can be adjusted from 0 to 100% to
achieve design air flow-rates. For the digital outputs, 0% corresponds to OFF
and 100% to ON.
Summary of Contents for FLSTDMAHUE
Page 2: ......
Page 4: ......
Page 91: ...ENG FLSTDMAHUE 030220961 rel 1 1 28 08 2019 91 ...
Page 92: ...ENG FLSTDMAHUE 030220961 rel 1 1 28 08 2019 92 ...
Page 93: ......