2 - 3
CHAPTER 2
•
Basic Sequence of Operation at Power-On
Power switch ON
Fixing roller 140˚C
*1
*1: WAIT End Conditions
25 sec or more passes after the start of supplying the fixing assembly with power and,
in addition, the temperature of the fixing assembly is 150˚C or higher.
27 sec or more passes after the start of supplying the fixing assembly with power and,
in addition, the temperature of the fixing assembly is 145˚C or higher.
WMUP
WMUPR
WAIT
STBY
Primary high
voltage(DC)
Main motor
(M101)
Registration clutch
(CL102)
Developing bias(AC)
Transfer high voltage
Fixing heater(H101)
Developing bias(DC)
Primary high
voltage(AC)
1.0
0.56 (approx.)
0.46 (approx.)
(unit: sec)
1.0 (approx.)
1.3
1.6
Figure 2-1-2
Summary of Contents for LBP-2000
Page 36: ...CHAPTER 1 1 30 ...
Page 38: ...CHAPTER 1 1 32 ...
Page 150: ......
Page 199: ...CHAPTER 4 4 48 D PCBs 1 2 3 4 5 Figure 4 9 4 Printer Paper Feeder ...
Page 203: ......
Page 206: ...APPENDIX A 2 ...
Page 222: ...CANONINC ...