3.)
Power unit ON and set up addressing for the managing boiler.
4.)
Power unit(s) on and set up proper addressing for each member boiler.
6.2 Group: More than 16 units in Cascade
Cascading more than 16 units is an additional capability designated . This configuration requires the managing boiler
to parallelly cascade out from its “Cascade IN/OUT” terminal to up to 4 additional units. These 4 units can then be further
cascaded following section 6.1 to each have their own branch of cascaded boilers.
1.) Routing the correct communications wiring to each individual boiler.
On PB Menu; go to settings
Boiler settings
Enter installer password: 1100
Enter Module Cascade Settings
Burner Address set to “Managing”
Enter the total number of boilers in this
group including the managing boiler.
On PB Menu; go to settings
Boiler settings
Enter installer password: 1100
Enter Module Cascade Settings
Burner Address set to “Dependent X”
(each subsequent dependent boiler
should be addressed from 1 to 15)
Summary of Contents for Valiant FT VA0080
Page 2: ......
Page 7: ......
Page 61: ...54 9 0 PIPING DIAGRAMS Figure 40 Single Boiler Hydronic Heating Zoned Piping...
Page 62: ...55 Figure 41 Multiple Boiler Hydronic Heating Zoned Piping...
Page 63: ...56 10 0 PARTS LIST...
Page 64: ...57...
Page 65: ...58...
Page 66: ...59...
Page 67: ...60...
Page 73: ...66 11 0 WIRING DIAGRAM...
Page 74: ...67 12 0 TUBING DIAGRAM...
Page 77: ...70...
Page 78: ...71 NOTES...
Page 79: ......