38
Figure 28: Home Screen
Parameter
Description
Demand
Central Heating (ARH)
Domestic Hot Water (ARW)
Lead Lag
Burner State Current Status of Avenger
Firing Rate
Target Firing Rate
Inlet
Inlet Water Temperature [°F]
Outlet
Outlet Water Temperature [°F]
Stack
Stack Temperature [°F]
DHW
DHW Temperature [°F], if equipped
Header
Header Temperature [°F], if equipped
Outdoor
Outdoor Temperature [°F], if equipped
Button
Description
Configure
Access Avenger parameters (CH Parameters, DHW Parameters, Outdoor Reset, Pump Configuration etc.)
Operation
Details of Boiler Operation (Set point, Firing Rate, Pump Status, Safety Circuit)
Diagnostics Manual Firing Rate, Analog/Digital Status
Details
History, Pump Status, Outlet Temperature
Sequence of Operation
Flow Switch
: Flow Switch, Water Pressure Switch (12 PSIG), Low Water Cut Off (if equipped)
Gas Pressure Switch
: Low Gas Pressure Switch (4.5” w.c., N/O), High Gas Pressure Switch (14” w.c, N/C)
Interrupted Air Switch
: Air Proving Switch (N/O)
Pump B: Avenger
™
Pump
Pilot Valve: (AR3000 – AR4000)
Summary of Contents for Avenger Series
Page 2: ......
Page 35: ...30 Figure 21 Recommended Piping with Reverse Return and Variable Primary Flow...
Page 84: ...79 Figure B BLOWER BURNER ASSEMBLY...
Page 87: ...82 Figure C TYPICAL GAS TRAIN AR1000 AR3000 Figure D TYPICAL GAS TRAIN AR3500 AR4000...
Page 89: ...84 Figure E CONTROL BOARD ASSEMBLY...
Page 92: ...87 PART 13 ELECTRICAL DIAGRAMS...
Page 93: ...88...
Page 94: ...89...
Page 95: ...90...
Page 96: ...91...
Page 97: ...92...
Page 98: ...93...
Page 99: ...94...
Page 100: ...95...
Page 101: ...96...
Page 102: ...97...
Page 103: ...98...
Page 104: ...99...
Page 105: ...100...
Page 106: ...101...