46
Base Load Rate Adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the
lead boiler will fire up to
the specified base load
rate (80%). If the
temperature is not
within Error threshold
(5
o
F) of setpoint after
Interstage delay (2
minutes) a lag boiler
will be brought online
and will also fire up to
the base load rate
specified.
•
Modulation of boilers
will only occur after all
boilers in the Lead Lag
system are firing up to
the specified base load
rate (80%).
1) Press
and
2) Press
[Lead Lag Master Configuration]
3) Press
[Advanced Settings >]
4) Press the to arrive at
Rate Allocation
5) Select
Base load common: (user defined)
Adjust Staging of Boilers
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the
lead boiler will fire up to
the specified base load
rate (80%). If the
temperature is not
within Error threshold
(5
o
F) of setpoint after
Interstage delay (2
minutes) a lag boiler
will be brought online
and will also fire up to
the base load rate
specified.
•
This method will then
be repeated for the
next lag boiler, if
available.
1) Press
and
2) Press
[Lead Lag Master Configuration]
3) Press
[Advanced Settings >]
4) Press the to arrive at
Add Stage
5) Select
Error threshold
6) Select
Interstage delay
Boiler Pump Operation (ALL Boilers)
Description
Electrical Connection(s)
Programming Instructions
•
To activate the boiler
pump on a call for heat.
This function also
includes a post pump
feature.
1) Select
Pump Configuration
2) Press
[Advanced Options >>]
3) Press the to arrive at
Central Heat Pump
or
DHW Pump
4) On Options: Local burner demand
5) On Options: Local Lead Lag Service Active
6) Force On: Outlet high limit
Summary of Contents for Avenger Series
Page 2: ......
Page 35: ...30 Figure 21 Recommended Piping with Reverse Return and Variable Primary Flow...
Page 84: ...79 Figure B BLOWER BURNER ASSEMBLY...
Page 87: ...82 Figure C TYPICAL GAS TRAIN AR1000 AR3000 Figure D TYPICAL GAS TRAIN AR3500 AR4000...
Page 89: ...84 Figure E CONTROL BOARD ASSEMBLY...
Page 92: ...87 PART 13 ELECTRICAL DIAGRAMS...
Page 93: ...88...
Page 94: ...89...
Page 95: ...90...
Page 96: ...91...
Page 97: ...92...
Page 98: ...93...
Page 99: ...94...
Page 100: ...95...
Page 101: ...96...
Page 102: ...97...
Page 103: ...98...
Page 104: ...99...
Page 105: ...100...
Page 106: ...101...