44
Slave Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Slave boiler lead lag
setup
•
System temperature
sensor must be
connected to boiler #1.
•
Outdoor temperature
sensor must be
connected to boiler #2.
1) Place toggle switch to
LOCAL
2) Press
and
3) Select
System Identification & Access
4) Verify
Modbus address
. To be in sequential order
5) Select
Lead Lag Slave Configuration
6) Select
Slave Enabled = Enable slave for built-in Lead Lag master
The following steps are performed at the factory and verifying on site
will be sufficient:
7) Select
Pump Configuration
8) Press
[Advanced Options >>]
9) Press the to arrive at
Central Heat Pump
or
DHW Pump
10) On Options: Local burner demand
11) On Options: Local Lead Lag Service Active
12) Force On: Outlet high limit
Master Boiler, System Sensor (Connected to Master Boiler #1)
Description
Electrical Connection(s)
Programming Instructions
•
Master boiler system
sensor configuration
•
System temperature
sensor must be
connected to boiler #1.
•
Outdoor temperature
sensor must be
connected to boiler #2.
1) Press
and
2) Press
[Sensor Configuration]
3) Select
S5 (J8-11) Sensor
4) Connector Type:
10K NTC Single Non-Safety
5) The control will proceed into a Lockout 2 condition
6) Press
[Verify]
>
[Begin]
>
[Yes]
7) Press the reset button on the ignition control within the alotted time
Outdoor Sensor Connected to Slave Boiler 2 (ARH ONLY)
Description
Electrical Connection(s)
Programming Instructions
•
Slave boiler outdoor
sensor configuration
•
Outdoor temperature
sensor must be
connected to boiler #2.
•
When done correctly,
the outdoor
temperature will be
shown on the Master
boiler
Slave Boiler
1) Press
and
2) Press
Sensor Configuration
3) Select
S5 (J8-11) Sensor
4) Select
Connector type = 10K single non-safety
Summary of Contents for Avenger Series
Page 2: ......
Page 35: ...30 Figure 21 Recommended Piping with Reverse Return and Variable Primary Flow...
Page 84: ...79 Figure B BLOWER BURNER ASSEMBLY...
Page 87: ...82 Figure C TYPICAL GAS TRAIN AR1000 AR3000 Figure D TYPICAL GAS TRAIN AR3500 AR4000...
Page 89: ...84 Figure E CONTROL BOARD ASSEMBLY...
Page 92: ...87 PART 13 ELECTRICAL DIAGRAMS...
Page 93: ...88...
Page 94: ...89...
Page 95: ...90...
Page 96: ...91...
Page 97: ...92...
Page 98: ...93...
Page 99: ...94...
Page 100: ...95...
Page 101: ...96...
Page 102: ...97...
Page 103: ...98...
Page 104: ...99...
Page 105: ...100...
Page 106: ...101...