POWER CONNECTION
CM9-2 INSTALL ATION AND OWNER MANUAL V.3.1 | 2023.06.01
PAGE 15
1. Use UL approved electrical wires, stranded copper, connected to 110-120V AC electricity. Electrical
wires MUST have a minimum capacity for 15 AMP current. See (FIGURE A) below for the correct electri-
cal wire gauge size. Wires must be placed in a PVC or other underground conduit.
2. Turn off the AC power from the main power source circuit breaker.
3. Connect the green wire to the green wire (GROUND) wire using a wire nut (FIGURE B).
a. Alternative: connect the green wire to the earth ground rod and AC ground wire nut.
Note: The earth ground rod can be grounded to the chassis.
4. Connect the white wire to the white wire (NAUTRAL) using a wire nut (FIGURE B).
5. Connect the black wire to the black wire (HOT LINE) using a wire nut (FIGURE B).
6. All operators MUST be properly grounded in order to prevent an electrical charge. Must use a dedicated
circuit for power supply.
7. Turn ON AC power from the main power source and turn the power switch on the gate operator to the ON
position. For DCFP (backup battery) and DCFP.S (solar and batteries) model gate operators, turn the
battery switch to the ON position (FIGURE C).
Green
White
Black
Green
White
Black
110 - 120V AC Power Cable
P. Box Power Cable (located in Box)
FIGURE A
FIGURE B
FIGURE C
Gauge
Distance
14 AWG
0 - 200 FT
12 AWG
201 - 400 FT
10 AWG
401 - 650 FT
08 AWG
651 - 1000 FT
04 AWG
1001 - 2000 FT
O
i
O
i