Solar Panels can be wired into the 24VDC SOLAR input
on the gate operator circuit board.
Multiple solar panels may be wired together to charge
the battery faster. We recommend two 24VDC solar
panels for optimal charging.
Place solar panel at a 45 degree angle, facing SOUTH.
Note: optimal angle and orientation may vary based on
your location and season.
Make sure the solar panel can receive direct sunlight. If a
tree, or other forms of shade blocks the solar panel,
move the solar panel to a different location.
Gate Operator Model Solar Compatibility:
•
CM3-DCNB - not solar ready, will require a
battery and battery circuit board upgrade
•
CM3-DCFP - solar ready
• CM3-DCNB - Not included, will require a battery and battery circuit board upgrade
• CM3-DCFB - Included, already installed
Solar Panel
Accessories
32
Battery
24V Batteries are added to the battery compartment at the bottom of the gate operator.
There is a separate battery circuit board that connects to the BAT input on the main gate operator
circuit board.
Batteries degrade over time depending on usage. Battery performance may decrease in extremely
cold temperatures - performance can be increased by adding insulation to the inside of the gate
operator battery compartment or adding a heater. The batteries should be replaced every 3-4 years.