EN1805CMINSA Rev. 5 2021-10
63
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL - Encore 29
C
le
an
in
g
an
d
San
it
iz
in
g
8
PREVENTIVE MAINTENANCE
All important parts of the unit must be maintained as per the preventive maintenance schedule to honor
the warranty and to avoid possible defects. Adequate maintenance will extend the life of the coffee
machine and deliver a consistent high quality beverage.
The preventive maintenance schedule and instructions below must be followed to
honor the warranty.
8.1
Preventive Maintenance (PM) Schedule
All parts must be visually inspected upon each visit and cleaned as needed.
Inspection
Preventive Maintenance
See Section
Overflow Tray
Weekly
Inspection
8.3
Brew Group
Assembly
Monthly
25,000 cycles
or annually
8.4
Outlet Valves
Quarterly
10,000 cycles
8.5
Hot Water Tank
Quarterly
60,000 cycles
8.6
Grinder
Quarterly
100,000 cycles
8.7
8.2
Recommended Tools for Servicing the Coffee Brewer
- #1 and #2 Phillips screwdrivers
- Flat-head screwdriver
- Adjustable wrench
- Wrench 1/4"
- Drive ratchet socket box 5/16" and 3/8"