37
IDROSTUFE A PELLET
7.20 ELECTRICAL CONNECTIONS
Terminal board contacts (see
Fig. 82
):
CONTACTS
POS.1-2 EXTERNAL THERMOSTAT/PUFFER THERMOSTAT
POS.3-4 PUFFER/BOILER PROBE
POS.5 EARTHING
POS.6-7 ADDITIONAL BOILER
POS.8 3-WAY VALVE NEUTRAL
POS.9 3-WAY VALVE PHASE (DHW)
POS.10 3-WAY VALVE PHASE (heating)
To access the “W” terminal board, remove the cap as shown in part 1 of the manual (in the paragraph dedicated to removing
the back), then loosen the two “z” screws and remove the “W” terminal board. Make the necessary connections and reassemble
everything.
The connections to the terminal board must be made with cables with a maximum length of 3 metres (regardless
of whether they are signal or power cables).
z
W
Fig. 83 - Connections
Fig. 84 - Connections
- The water manostat cables that are prearranged in the boiler must be connected to the
hydraulic kit (optional).
- The flow switch cables are prearranged in the boiler for connection to the hydraulic kit (op-
tional) with domestic water.
7.21 REAR PANEL
If maintenance must be performed on a component of the stove, the rear panel can be removed (if the distances from the walls
allow it), otherwise, the maintenance can be performed by removing the side of the stove.
To remove the rear panel, remove the seven rear screws “a” and pull panel “L” away.
The “L” panel can also be removed with the stove installed since its shape corresponds with the smoke outlet pipe. Plate “L1” sup-
ports the flue pipe as it is secured to the stove using the two screws “a”. With the stove installed you must only remove plate “L1” if
the smoke pipe must be removed, otherwise remove only plate “L”.
Summary of Contents for AQUOS3 16
Page 54: ...NOTE ...
Page 55: ...NOTE ...