35
IDROSTUFE A PELLET
Hydraulic diagram
:
7
6
4
5
2
1
5
3
Fig. 79 - System with: pellet stove and puffer
LEGEND
Fig. 79
1
Pellet Boiler
2
Rear terminal board
3
Anti-condensate valve
4
Puffer
5
Puffer probe
6
System pump
7
Room thermostat
7.18 SYSTEM WITH: PELLET STOVE, PUFFER, AND AUXILIARY BOILER (WALL MOUNTED)
Settable settings
:
SETTING
VALUES
PUFFER TEMP.
55° C - 75°C
Parameters to set
:
SETTING
VALUES
Configuration
5
Auxiliary Boiler
ON
Hydraulic diagram
:
Summary of Contents for AQUOS3 16
Page 54: ...NOTE ...
Page 55: ...NOTE ...