INSTRUCTION, USE AND
MAINTENANCE MANUAL
Page 39 of 111
GB
AIKIDO.34LIGHT-AIKIDO.34LIGHTFI
7101-M001-0_B
6. Lift the tool (see
Fig. 37
,
pos 1
) maintening it coupled
to the upper bead of the tyre with the lower roller.
7. Place the tool (see
Fig. 38
,
pos 1
) near the rim edge.
Using the lower roller, load the lower bead on the tool
in demounting position.
Fig. 37
Fig. 36
Fig. 38
1
1
Fig. 34
Fig. 35
1
4. Lift the tool through the provided control (
Fig. 14
Pos. H
). When the tool reaches a vertical position
related to the rim (
Fig. 35 Pos. 1
), rotate the chuck
so that the tyre enters the rim channel. Keep on lift-
ing the tool until the bead is on the rim edge (see
Fig.
34
).
5. Rotate in clockwise sense until the upper bead is
completely disassembled (see
Fig. 36
).
8. Rotate the chuck in clockwise sense until the tyre is
completely disassembled.