OPERATION
RTXG SERIES TILLER 5/19
Operation Section 4-10
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
6.1 Connecting the Implement
1. Make sure the tractor is equipped with the
correct PTO shaft. Change shafts if needed.
2. Shorten or remove the tractor drawbar to avoid
interference when raising and lowering the
implement.
3. Board the tractor and start the engine. Position
the tractor to the implement with the 3-point lift
arms positioned at the same height and to the
outside of the implement hitch pins.
Note:
Set
the 3-point lift control to “Position Control” so
that the lift arms maintain a constant height
when attaching the implement. See the tractor
Operator’s Manual for correct settings when
attaching 3-point equipment.
4. Turn off the tractor engine and dismount.
5. One lift arm at a time, align arm end hole
between the set of A-frame lift lugs. Insert hitch
pin through the lug and arm holes and insert
retaining pin into hitch pin.
6. Walk around to opposite side and repeat
procedure for remaining lift arm and hitch pin.
7. Extend or retract 3-point top link to align its end
hole with the holes of the implements top link.
Insert the top link hitch pin and insert retaining
pin into hitch pin.
8. Adjust any lower link check chains, guide
blocks, or sway blocks to prevent the
implement from swaying side to side and
possible contact with tractor rear tires.
IMPORTANT: Scan this QR Code with your smart phone to link to the PAMI Safe
Implement Hitching Manual for more information on correctly connecting
agricultural tractors to implements. Or type in your internet browser the following
web address: www.algqr.com/hme
Ops-0008-MISC
Summary of Contents for RTX85G
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY RTXG SERIES TILLER 5 19 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Location...
Page 19: ...SAFETY RTXG SERIES TILLER 5 19 Safety Section 1 15 SAFETY 2020 Alamo Group Inc...
Page 21: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 26: ......
Page 27: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 33: ...Operation Section 4 1 OPERATION SECTION...
Page 62: ......
Page 63: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 69: ...MAINTENANCE RTXG SERIES TILLER 5 19 Maintenance Section 5 7 MAINTENANCE 2020 Alamo Group Inc...
Page 70: ......
Page 72: ...RTXG Series Tiller SOM 5 19 P N 50075826 RTX85G RTX92G ROTARY TILLER...