c. Tighten locking band by HAND with a 5/16”
nut driver until snug plus ¼ turn. DO NOT
SECURE JOINTS WITH SHEET METAL
SCREWS OR POP RIVETS. DO NOT
PUNCTURE THE VENT SYSTEM!
d. Once the installation is complete, operate
appliance and inspect all joints to ensure that flue
gases and/or liquid condensate will not escape.
D.
Separate Horizontal Venting System.
See Figures 4A,
4B and 5. See Figure 29 on Page 48 for Blower Vent
Connector Assembly.
Vent Piping
–
1. This boiler is supplied with components as standard
equipment for installation of the separate horizontal
venting system.
2. Do not exceed maximum vent/air intake lengths.
Refer to Table 4.
3. Recommended horizontal installation consists
of vent being sloped down ¼ inch per foot away
from boiler. See Figure 4A. See Figure 4B for an
alternate horizontal installation.
4. Use appropriate designed thimbles when passing
through combustible walls (thimble use optional for
noncombustible walls). Insert thimble through wall
from outside. Secure outside flange to wall with
nails or screws, and seal ID, OD and vent holes with
sealant material. Install inside flange to inside wall,
secure with nails or screws, and seal with sealant
material.
5. For noncombustible wall application when thimble
is not used, size opening such that bell with locking
band attached cannot pass through.
6. Join vent terminal to vent pipe. See Figure 5.
7. Insert vent pipe through thimble/opening from
outside and join to vent system. Apply sealant
between vent pipe and opening/thimble to provide
weathertight seal.
Summary of Contents for PVG
Page 6: ... Figure 2 Dimensions ...
Page 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Page 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Page 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Page 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Page 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Page 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Page 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Page 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Page 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Page 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Page 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 39: ...39 Figure 21 Modular Boiler Piping ...
Page 41: ...41 Figure 22 Operating Instructions ...
Page 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Page 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 56: ...56 ...
Page 60: ...60 ...
Page 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...