![Burnham PVG Installation, Operating And Service Instructions Download Page 17](http://html.mh-extra.com/html/burnham/pvg/pvg_installation-operating-and-service-instructions_2832965017.webp)
17
Vertical Venting
–
1. See Figure 29 on Page 48 for Blower Vent
Connector Assembly. Do not exceed maximum vent
lengths. Refer to Table 4.
2. Installation of a vertical vent drain tee 8116304U
is required on all vertical vent applications. See
Figures 6 and 7. Attach vertical vent drain tee
directly to elbow or horizontal pipe from an elbow
immediately after vent connector.
3. Slope horizontal runs minimum ¼ inch per foot.
Slope towards vertical vent drain tee. Position weld
seams in vent pipes, in all horizontal runs, at the top
to avoid condensate from lying on the seams.
4. Install fire stops where vent passes through floors,
ceilings or framed walls. The fire stop must close
the opening between the vent pipe and the structure.
E. Separate Vertical Venting System
- See Figures 6, 7, 8 and 9.
NOTICE
Roof penetrations require the use of roof flashing
and storm collar - not supplied with boiler.
5. Whenever possible, install vent straight through
the roof. Refer to Figure 7 if offset is necessary.
Maintain minimum clearance to combustible
materials.
6. Install Vent Terminal.
a. Size roof opening to maintain minimum
clearance from combustible materials.
b. Extend vent pipe to maintain minimum vertical
and horizontal distance of twelve (12) inches
from roof surface. Allow additional vertical
distance for expected snow accumulation.
Provide brace as required. Refer to Figure 8.
c. Install storm collar on vent pipe immediately
above flashing. Apply Dow Corning Silastic 732
RTV Sealant between vent pipe and storm collar
to provide weathertight seal.
d. Attach vent terminal.
Summary of Contents for PVG
Page 6: ... Figure 2 Dimensions ...
Page 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Page 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Page 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Page 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Page 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Page 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Page 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Page 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Page 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Page 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Page 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 39: ...39 Figure 21 Modular Boiler Piping ...
Page 41: ...41 Figure 22 Operating Instructions ...
Page 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Page 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 56: ...56 ...
Page 60: ...60 ...
Page 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...