4. All above ground gas piping upstream from manual
shut-off valve must be electrically continuous and
bonded to a grounding electrode. Do not use gas
piping as grounding electrode. Refer to
National
Electrical Code
, NFPA 70.
C.
Pressure test.
The boiler and its gas connection must
be leak tested before placing boiler in operation.
1. Protect boiler gas control valve. For all testing over
½ psig, boiler and its individual shutoff valve must
be disconnected from gas supply piping. For testing
at ½ psig or less, isolate boiler from gas supply
piping by closing boiler’s individual manual shutoff
valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonflammable
solution.
DANGER
Do not use matches, candles, open flames or
other ignition source to check for leaks.
Summary of Contents for PVG
Page 6: ... Figure 2 Dimensions ...
Page 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Page 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Page 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Page 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Page 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Page 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Page 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Page 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Page 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Page 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Page 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 39: ...39 Figure 21 Modular Boiler Piping ...
Page 41: ...41 Figure 22 Operating Instructions ...
Page 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Page 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 56: ...56 ...
Page 60: ...60 ...
Page 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...