45
I.
Sequence of Operation.
See Figure 25. If boiler fails
to operate properly, see Troubleshooting Tree in Section
IX: Service.
J.
Check pilot burner flame.
See Figure 27. Flame
should be steady, medium hard blue enveloping 3/8 to
½ inch of sensing probe.
K.
Check main burner flame.
See Figures 26. Flame
should have clearly defined inner cone with no yellow
tipping. Orange-yellow streaks should not be confused
with true yellow tipping.
Figure 26: 1 Inch Main Burner flame
Figure 7: Pilot Burner Flame
Figure 25: Sequence of Operation
L
. Check thermostat operation.
Raise and lower
temperature setting to start and stop boiler operation.
M.
Check ignition control module shut-off.
Disconnect
pilot lead wires from gas valve. If burners do not
shutdown, determine cause of malfunction. Replace
necessary items and check operation.
N.
Check low water cutoff
(if so equipped).
1. Adjust thermostat to highest setting.
2. With boiler operating, open drain valve and slowly
drain boiler.
3. Main burners and pilot burner will extinguish and
blower will stop when water level drops below low
water cutoff probe. Verify limit, thermostat or other
controls have not shut off boiler.
4. Adjust thermostat to lowest setting. Refill boiler.
O.
Check limit.
1. Adjust thermostat to highest setting.
2. Observe temperature gauge. When temperature is
indicated, adjust limit to setting below observed
Summary of Contents for PVG
Page 6: ... Figure 2 Dimensions ...
Page 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Page 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Page 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Page 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Page 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Page 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Page 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Page 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Page 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Page 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Page 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 39: ...39 Figure 21 Modular Boiler Piping ...
Page 41: ...41 Figure 22 Operating Instructions ...
Page 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Page 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 56: ...56 ...
Page 60: ...60 ...
Page 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...