6
Key
No.
Description
[Quantity] Part Number
PVG-3
PVG-4
PVG-5
PVG-6
PVG-7
PVG-8
PVG-9
7. JACKET PARTS
7A
Left Side Panel
60407002
7B
Right Side Panel
60407001
7C
Rear Panel
60407033 60407043 60407053 60407063 60407073 60407083 60407093
7D Vestibule Panel
60407034 60407044 60407054 60407064 60407074 60407084 60407094
7E
Top Panel
60407032 60407042 60407052 60407062 60407072 60407082 60407092
7F
Front Door
101354-03 101354-04 101354-05 101354-06
101354-07
101354-08
101354-09
7G Jacket Cover Plate
80407001
7H
Handle
8056184
7J
Door Clip
[2] 7041921
7K
Bushing
8136048
7L
Burnham Hydronics Logo
81460099
Summary of Contents for PVG
Page 6: ... Figure 2 Dimensions ...
Page 14: ...14 Figure 4A Recommended Horizontal Vent Installation ...
Page 15: ...15 Figure 4B Alternate Horizontal Vent Installation ...
Page 16: ...16 Figure 5 Horizontal Vent Terminal Configuration 3 or 4 Vent ...
Page 18: ...18 Figure 7 Attic Offset Figure 6 Vertical Vent Installation ...
Page 24: ...24 Figure 11 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Page 25: ...25 Figure 12 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Page 30: ...30 Figure 14 Internal Boiler Wiring Schematic Diagram ...
Page 33: ...33 Figure 16 Single Heating Zone Only Wiring Schematic ...
Page 35: ...35 Figure 18 Circulator Zoned System Wiring Schematic ...
Page 36: ...36 Figure 19 Zone Valve Zoned System Wiring Schematic ...
Page 37: ...37 Figure 20 Different Manufacturer s Zone Valve Connections to Honeywell R8889 ...
Page 39: ...39 Figure 21 Modular Boiler Piping ...
Page 41: ...41 Figure 22 Operating Instructions ...
Page 44: ...44 Honeywell Electronic Ignition Troubleshooting Guide Figure 24 Troubleshooting Guide ...
Page 49: ...49 Figure 30 Flue and Burner Cleanout 1 Burner ...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 56: ...56 ...
Page 60: ...60 ...
Page 66: ...66 SERVICE RECORD DATE SERVICE PERFORMED ...