Table XII: Recommended Periodic Testing Check List
Item
Frequency
Accomplished by
Remarks
Gauges and Indicators
Daily
Operator
Make visual inspection and record
readings in log
Instrument and Equipment
Settings
Daily
Operator
Make visual check against
recommended specifications
Firing Rate Control
Weekly
Semiannually
Annually
Operator
Service Technician
Service Technician
Verify factory settings
Verify factory settings
Check with combustion test
Flue, Vent, Stack, or
Outlet Dampers
Monthly
Operator
Make visual inspection of linkage;
Check for proper operation
Igniter
Weekly
Operator
Make visual inspection; Check flame
signal strength if meter-fitted (See
“Combustion Safety Controls”)
Fuel Valves
Pilot and Main
Pilot and Main Gas or Main Oil
Weekly
Annually
Operator
Service Technician
Open limit switch; Make aural and
visual check; Check valve position
indicators and fuel meters, if so
fitted
Perform leakage tests
(Refer to burner instructions)
Combustion Safety Controls
Flame Failure
Flame Signal Strength
Weekly
Weekly
Operator
Operator
Close manual fuel supply for (1)
pilot, (2) main fuel cock, and/or
valve(s); Check safety shutdown
timing; Record in Log
If flame signal meter installed, read
and log; For both pilot and main
flames, notify service organization if
readings are very high, very low, or
fluctuating (Refer to burner instruc
-
tions)
Pilot Turndown Tests
As required / annually
Service Technician
Required after any adjustments to
flame scanner mount or pilot burner;
Verify annually (Refer to burner
instructions)
Hot Refractory Hold-In
As required / annually
Service Technician
See “Pilot Turndown Tests”
Low Water Cutoff and Alarm
Daily / Weekly
Semiannually
Operator
Operator
Refer to instructions
Perform a slow drain test in accor-
dance with ASME Boiler and Pres-
sure Vessel Code Section VI
(continued)
Summary of Contents for MPC
Page 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Page 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Page 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Page 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Page 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Page 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Page 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Page 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Page 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Page 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Page 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Page 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Page 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...