![Burnham MPC Installation And Operation Manual Download Page 43](http://html.mh-extra.com/html/burnham/mpc/mpc_installation-and-operation-manual_2832959043.webp)
Table X: Jacket Top Corner / Intermediate Panel Arrangement
Boiler Size
Side of
Boiler
Order of Assembly (* See Panel Designation Below)
Front
f
Block Assembly
g
Rear
4 Section
Left
27” TCP w/J
6¾” TCP w/H
Right
6¾” TCP w/H
27” TCP w/J
5 Section
Left
33¾” TCP w/J
6¾” TCP w/H
Right
6¾” TCP w/H
33¾” TCP w/J
6 Section
Left
40½” TCP w/J
6¾” TCP w/H
Right
6¾” TCP w/H
40½” TCP w/J
7 Section
Left
27” TCP w/J
27” TCP w/H
Right
27” TCP w/H
27” TCP w/J
8 Section
Left
33¾” TCP w/J
27” TCP w/H
Right
27” TCP w/H
33¾” TCP w/J
9 Section
Left
33¾” TCP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
33¾” TCP w/J
10 Section
Left
40½” TCP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
40½” TCP w/J
11 Section
Left
40½” TCP w/J
40½” TCP w/H
Right
40½” TCP w/H
40½” TCP w/J
12 Section
Left
34¾” TCP w/J
27” TIP w/J
27” TCP w/H
Right
27” TCP w/H
27” TIP w/J
34¾” TCP w/J
13 Section
Left
34¾” TCP w/J
27” TIP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
27” TIP w/J
34¾” TCP w/J
14 Section
Left
34¾” TCP w/J
33-¾” TCP w/J
33¾” TCP w/H
Right
34¾” TCP w/H
33¾” TIP w/J
34¾” TCP w/J
15 Section
Left
40½” TCP w/J
33¾” TIP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
33¾” TIP w/J
40½” TCP w/J
16 Section
Left
40½” TCP w/J
33¾” TIP w/J
40½” TCP w/H
Right
40½” TCP w/H
33¾” TIP w/J
40½” TCP w/J
17 Section
Left
33¾” TCP w/J
27” TIP w/J
27” TIP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
27” TIP w/J
27” TIP w/J
33¾” TCP w/J
18 Section
Left
33¾” TCP w/J
33¾” TIP w/J
27” TIP w/J
33¾” TCP w/H
Right
33¾” TCP w/H
27” TIP w/J
33¾” TIP w/J
33¾” TCP w/J
* Panel Designations:
TCP w/J = Top Corner Panel w/ Joiner Bracket
TCP w/H = Top Corner Panel w/ Holes
TIP w/J = Top Intermediate Panel w/ Joiner Bracket
f.
Locate Jacket Top Corner Panels packed in carton
marked ‘JC-2’. Install Jacket Top Corner Panels per
order of assembly shown in Table X, also refer to
illustration in Figure 26.
step 1.
On 4 thru 6 Section Boilers, assemble top
corner panel #1 to 6¾” top corner panel #2 using
two (2) #8 x ½” lg. hex head sheet metal screws,
before installing on frame rails as noted in Step 2.
step 2.
Starting on the left side, at the front, secure
top corner panel #1 to front horizontal and vertical
frame rails with two (2) #8 x ½” lg. hex head sheet
metal screws (SMS).
step 3.
Secure top corner panel #1 to next set of frame
rails with two (2) #8 x ½” lg. SMS, see Figure 26,
Detail A. If necessary, push or pull frame rails to
align holes.
NOTE:
Like the lower tie bars installed
previously, these top corner panels
maintain the proper distance between
frame rails for assembly of remaining
jacket panels.
step 4.
On 7 thru 11 Section Boilers, locate top corner
panel #2 per Table X and secure to panel #1 using
two (2) #8 x ½” lg. hex head SMS. Align mounting
holes in panel #2 with holes in frame rails and
secure with two (2) #8 x ½” lg. hex head SMS.
Summary of Contents for MPC
Page 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Page 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Page 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Page 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Page 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Page 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Page 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Page 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Page 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Page 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Page 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Page 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Page 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...