9
Figure : Install
nd
Pass Flueway Baffles
Figure : Install
rd
Pass Flueway Baffles (4 thru 11 Section Boilers Only)
2. On 4 thru 18 Section Boilers - Install four (4) second
pass baffles into second pass flueways until handle
is flush with face of casting as shown in Figure 33,
Detail A.
Lift door high enough to move hinge pockets through
opening in jacket front panel. Engage hinge loop
attached to door over hinge pin attached to block
assembly. Lower door to rest weight on hinge pin
brackets.
M.
Locate Flueway Baffle Carton(s) marked ‘2FB’ and
‘3FB’ and remove contents. Check Equipment Check
List for proper baffle length and usage per boiler size.
1. On 4 thru 11 Section Boilers - Install four (4) third
pass baffles into third pass flueways until handle is
flush with face of casting as shown in Figure 32,
Detail A.
Summary of Contents for MPC
Page 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Page 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Page 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Page 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Page 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Page 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Page 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Page 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Page 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Page 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Page 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Page 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Page 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...