2
Figure 5: Field installation of CPVC/PVC Two-Pipe Vent System Connector - Floor Mounted Boiler Builds
Figure : Expansion Loop and Offset
iV. Venting (continued)
2 L
5
6"
MIN
6"
MIN
5
4
4
2
LONG RUN OF PIPE
CHANGE OF DIRECTION
(VERTICAL OR HORIZONTAL)
LOOP
(HORIZONTAL ONLY)
(TOP VIEW)
OFFSET
L
L
L
(L)
LOOP LENGTH
L
L
L
RESTRAINT (RESTRICTS MOVEMENT)
HANGER (ALLOWS MOVEMENT)
KEY
PIPE DIA.
(IN.)
LENGTH OF
STRAIGHT RUN
(FT.)
LOOP LENGTH
(L) (IN.)
3
20
50
30
61
40
70
50
79
60
86
4
20
56
30
69
40
80
50
89
60
98
Summary of Contents for Alpine ALP080
Page 40: ...40 Figure 29 Condensate Trap and Drain Line V Condensate Disposal continued ...
Page 56: ...56 VIII Electrical continued ...
Page 57: ...57 VIII Electrical continued Figure 35 Wiring Connections Diagram ...
Page 58: ...58 Figure 36 Ladder Diagram VIII Electrical continued ...
Page 64: ...64 Figure 39 Modular Boiler Direct Vent Termination X Modular Installation continued ...
Page 65: ...65 Figure 40 Modular Boiler Concentric Vent Termination X Modular Installation continued ...