6
Figure
1:
n
ear Boiler Piping - Heating Only
V
i. W
ater Piping and T
rim (continued)
C
a
UT
iO
n
it
is
the
installers
responsibility
to
select
pumps
and
boiler
piping
configurations
that
provide
the
proper
flow
rates
and
performance
for
the
boiler
and indirect water heater
.
Refer
to
T
able
12
for
recommended
Boiler
Loop
Circulator
.
Summary of Contents for Alpine ALP080
Page 40: ...40 Figure 29 Condensate Trap and Drain Line V Condensate Disposal continued ...
Page 56: ...56 VIII Electrical continued ...
Page 57: ...57 VIII Electrical continued Figure 35 Wiring Connections Diagram ...
Page 58: ...58 Figure 36 Ladder Diagram VIII Electrical continued ...
Page 64: ...64 Figure 39 Modular Boiler Direct Vent Termination X Modular Installation continued ...
Page 65: ...65 Figure 40 Modular Boiler Concentric Vent Termination X Modular Installation continued ...