0
Vent System
Component
Part Numbers
Equivalent
Feet of Pipe
ALP080 - 210
ALP285 - 500
3" Vent
4" Vent
SS Vent Kit
102501-01
102501-02
N/A
Horizontal Vent
Terminal
(Included in Kit)
8116310
8116313
PVC to SS Vent
Adapter
(Included In Kit)
102219-01
102220-01
Vertical
Vent Terminal
102680-01
102680-02
N/A
Pipe
x
1 Ft.
8116296U
100176-01
1
Pipe
x
3 Ft.
8116298U
100177-01
3
Pipe
x
5 Ft.
8116300U
100178-01
5
Pipe x Adjustable
8116319U
100179-01
Equal to
Installed
Length
(1.06 to 1.64)
90° Elbow
8116294U
100180-01
5.5 (3")
8.0 (4")
45° Elbow
8116292U
100181-01
4.0 (3")
4.5 (4")
Horizontal Drain Tee
8116302U
100182-01
2
Vertical Drain Tee
8116304U
100183-01
7½
Single Wall Thimble
8116116
100184-01
N/A
Table 8a: U.S. Boiler Vent System Components
(Stainless Steel)
iV. Venting (continued)
Manufacturer
Vent
System
Size
Wall Thimbles
Horizontal Termination
Vertical
Termination
Protech
Systems
Inc..
FasNseal
3
FSWT3
Tee: FSTT3
FSBS3
4
FSWT4
Tee: FSTT4
FSBS4
Z-Flex
SVE
Series III
(“Z-Vent III”)
3
2SVSWTEF03
Tee: 2SVSTTF03
24SVSTPF03
4
2SVSWTEF04
Tee: 2SVSTTF04
24SVSTPF04
Flex-L Intl.
Star-34
3
SR03WT15
Tee: SRTT-03
SRTP-03
4
SR04WT15
Tee: SRTT-04
SRTP-04
NOTE: See vent system manufacturer’s literature for other part numbers that are required such as straight pipe, elbows, firestops
and vent supports.
Table 8B: alternate Vent Systems and Vent Components (Stainless Steel)
• Male end of terminal will fit into the
female end of any of the approved
stainless vent systems.
•
Apply a heavy bead of silicone to the
male end of the terminal before inserting
it into the last piece of pipe. Orient the
terminal so that the seam in the terminal
is at 12:00.
•
Smooth the silicone over the seam
between the terminal and the last piece
of pipe, applying additional silicone if
necessary to ensure a tight seal.
•
Allow the silicone to cure per the
silicone manufacturer’s instructions
before operating the boiler.
ii.
Combustion Air Termination
•
Horizontal intake terminal is a tee in the
upright position. Tee should protrude
the same distance from the wall as the
exhaust terminal. See Figure 8.
• Install a rodent screen (not supplied) in
the inlet terminal. Use a screen having
1/2”
(2 x 2) or larger mesh.
b. Optional Two-Pipe Snorkel Termination
Refer to Figure 10.
This installation will allow a maximum of
seven (7) feet vertical exterior run of the vent/
combustion air piping to be installed on the
approved AL29C Stainless Steel horizontal
venting application.
i.
Vent Termination
•
After penetrating wall, install the
appropriate manufacturer's 90° elbow so
that the elbow leg is in the up direction.
•
Install maximum vertical run of seven
(7) feet of appropriate manufacturer's
vent pipe. See Figure 10.
•
At top of vent pipe length install another
appropriate manufacturer's 90° elbow
so that the elbow leg is opposite the
building's exterior surface.
• Install horizontal vent terminal.
•
Brace exterior piping if required.
ii.
Combustion Air Termination
•
After penetrating wall, install a 90°
elbow so that the elbow leg is in the up
direction.
•
Install maximum vertical run of seven
(7) feet of combustion air pipe. See
Figure 10.
•
At top of vent pipe length install another
90° elbow os that the elbow leg is
opposite the building's exterior surface.
Summary of Contents for Alpine ALP080
Page 40: ...40 Figure 29 Condensate Trap and Drain Line V Condensate Disposal continued ...
Page 56: ...56 VIII Electrical continued ...
Page 57: ...57 VIII Electrical continued Figure 35 Wiring Connections Diagram ...
Page 58: ...58 Figure 36 Ladder Diagram VIII Electrical continued ...
Page 64: ...64 Figure 39 Modular Boiler Direct Vent Termination X Modular Installation continued ...
Page 65: ...65 Figure 40 Modular Boiler Concentric Vent Termination X Modular Installation continued ...