![Burkert 8756 BATCH Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/burkert-0/8756-batch/8756-batch_operating-instructions-manual_2832389022.webp)
Type 8756 BATCH
Fluid connection
22
5.2
Installation steps
1. Do the fluid installation into the pipe. Refer to chapter:
2. Do the electrical installation. Refer to chapter:
3. Commission the product. Refer to chapter:
5.3
Installation procedure
5.3.1
Installation
No inlet section and no outlet section for flow conditioning are required.
Install the product with the on/off valve Type 6013
Flow direction
Optimal 1 metre
Fig. 8: Mounting position for an MFC BATCH with on/off valve Type 6013
Install the product with the on/off valve Type 6724
Flow direction
Optimal 1 metre
Fig. 9: Mounting position for an MFC BATCH with on/off valve Type 6724
5.3.2
G1/8''-internal-threaded fluid connections
Remove the protective cap that closes the threaded connection.
Do the fluid connection on one side of the product.
Obey the instructions that are given by the manufacturer of the fitting used.
Obey the torques that are given by the manufacturer of the fitting used.
Do the fluid connection on the other side of the product in the same way.
5.3.3
NPT1/8''-internal-threaded fluid connections
Do the fluid connection on one side of the product.
Obey the instructions that are given by the manufacturer of the fitting used.
Obey the torques that are given by the manufacturer of the fitting used.
Do the fluid connection on the other side of the product in the same way.