background image

Page 4

ELECTRICAL REQUIREMENTS

CAUTION - 

The brewer must be disconnected from the power source until specified in 

Initial Set-Up.

120V model brewer requires 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.
Proceed as follows:

Electrical Hook-Up

CAUTION –

Improper electrical installation will damage electronic components.

1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage at the electrical source.
3. Connect the brewer to the power source.
4. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing

has been hooked up, the brewer is ready for 

Initial Set-Up.

PLUMBING REQUIREMENTS

The brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138

and 620 kPa) from a 

1

2

" or larger supply line.  A shut-off valve should be installed in the line before the brewer.

Install a regulator in the line when pressure is greater than 90 psi(620 kPa) to reduce it to 50 psi(345 kPa).  The
water inlet fitting is 

1

4

" flare.

NOTE - 

Bunn-O-Matic recommends 

1

4

" copper tubing for installations of less than 25 feet and 

3

8

" for more than

25 feet from the 

1

2

" water supply line.  A tight coil of copper tubing in the water line will facilitate moving the

brewer to clean the countertop.  Bunn-O-Matic does not recommend the use of a saddle valve to install the
brewer.  The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the

Building Officials and Code Administrators International, Inc. (BOCA)

and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

P2183

33030 052600

1. Remove the shipping cap from the bulkhead fitting on the rear of the brewer.
2. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the water inlet

fitting at the rear of the brewer.

3. Flush the water line and securely attach it to the flare fitting on the strainer/flow control.
4. Turn on the water supply.

Summary of Contents for TU3QF-EZ

Page 1: ...SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 www bunnomatic com TU3QF EZ OPERATING SERVICE MANUAL 33030 0000F 8 01 2000 Bunn O Matic Corporation BUNN DISCONTINUED VERSION The in...

Page 2: ...NG WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR...

Page 3: ...0000 USER NOTICES Carefully read and follow all notices on the equipment and in this manual They were written for your protec tion All notices on the equipment should be kept in good condition Replace...

Page 4: ...en pressure is greater than 90 psi 620 kPa to reduce it to 50 psi 345 kPa The water inlet fitting is 1 4 flare NOTE Bunn O Matic recommends 1 4 copper tubing for installations of less than 25 feet and...

Page 5: ...ase the START switch 11 Allow the cycle to finish and measure the amount of water in the container It should be 512 ounces 2 Refer to the adjustments section of this manual should the volume need to b...

Page 6: ...rails Make sure faucet is closed and lid cover is removed 6 Place the ON OFF switch to the ON position Press and release the Sanitize Switch 7 After sanitize cycle ends let reservoir soak then empty...

Page 7: ...arily press and release the brew start switch once for each two seconds to be added to the prior setting 5 Allow the cycle to finish The brewer is now set to dispense this amount of water for each sub...

Page 8: ...mes Keep away from combustibles WARNING Exercise extreme caution when servicing electrical equipment Unplug the brewer when servicing except when electrical tests are specified Follow recommended serv...

Page 9: ...n due to malfunction See Diagnostic Chart in manual page 14 or under top lid of brewer Water lines and valves to the brewer must be open Check for voltage across the black and white terminals at the p...

Page 10: ...use the time as reference to determine if time has changed Inspect the sprayhead tube and sprayhead for excessive lime de posits Delime as required Refer to Service Brew Solenoid Valve for testing pro...

Page 11: ...be used for proper ex traction Place an empty brew funnel on an empty vessel of at least 4 gallons beneath the sprayhead Initiate brew cycle and check the water temperature immediately below the spra...

Page 12: ...under top lid Remove probe and grommet Look into hole on tank lid Water must be within one inch from top of tank Remove the probe from the grom met and submerge in a water bath of approximately 70 F...

Page 13: ...er to pins 2 and 3 of the J5 connector At 60 F the reading should be 15 3k 2k OHMS at 70 F the reading should be 11 8k 2k OHMS and at 80 F the reading should be 9 3k 2k OHMS If the probe is within the...

Page 14: ...Tank Level Fault Water pressure Level probe dry too long after fill valve is energized Level probe wiring Temperature probe wiring Fill valve wiring function strainer 3 Low Water Temperature Fault Tan...

Page 15: ...he removal of any panel or the replace ment of any component All components are accessible by the removal of the top cover and rear access panel The top cover is attached with one 4 40 screw Removal o...

Page 16: ...d valve for coil action Connect the brewer to the power source With ON OFF switch in the ON upper position press start switch and listen carefully in the vicinity of the solenoid valve for a clicking...

Page 17: ...tinuity is not present as described replace the solenoid valve 6 Check the solenoid valve for coil action Connect the brewer to the power source When pressing the faucet switch in the Green Tea positi...

Page 18: ...ress switch for Green Tea Continu ity should be present 4 Check for continuity across the violet and yellow terminals Press switch for Black Tea Continuity should be present No continuity should be pr...

Page 19: ...to the sprayhead Removethedispensevalveandinspectfor wear and remove waterborne particles If the sound is not heard as described proceed to 6 P2158 40 6 Connect the voltmeter lead ends to the hot wate...

Page 20: ...ostat 5 Check the voltage across the exposed terminal of the limit thermostat and the white wire on the tank heater with a voltmeter Connect the brewer to the power source The indication must be 120 v...

Page 21: ...s not present as described refer to the Wir ing Diagram and check the wiring harness 6 Check for continuity across the center and end terminals of the bottom row when the switch is in the ON position...

Page 22: ...s the two terminals on the side of the switch from which the wires were removed when the switch is held in the lower po sition Continuity must not be present across these terminals in the upper positi...

Page 23: ...held in the lower po sition Continuity must not be present across these terminals in the upper position If continuity is present as described the switch is operating properly If continuity is not pres...

Page 24: ...k for continuity across the tank heater termi nals If continuity is present as described reconnect the wires the tank heater is operating properly If continuity is not present as described replace the...

Page 25: ...in connector J 1 and the 6 pin connector J 5 from the main wiring harness FIG 21 BOARD WIRING P2151 50 4 Disconnect the 2 pin connector J 7 from the ready indicator LED 5 Remove the four 6 32 screws s...

Page 26: ...CH READY IND SANITIZE SWITCH START SWITCH SW3 GRN SW2 SW1 WHI ORA WHI YEL WHI RED ON OFF SWITCH SOL SOL SOL BREW FAUCET COLD WATER MIX N GRN K1 K1 WHI VIO BLK BLK BLK BLK BLK BLK BLK BLK 14 BLK 14 BLK...

Reviews: