
10
19.
Remove the bottom #10 screw from the
left, aft corner of the controller that
faces the coolant pail. Loosen the top
screw that holds the J shaped hose
support. Swing the support down and
reinsert the bottom screw.
Place the coolant hose and power
cable on this support to maintain an
angle that keeps coolant from following
the hose to the floor.
20.
Verify AC power off!
Attach the X interconnect cable 16 pin Amp connector to the
controller. The controller connector has a keying pin to prevent installation on the Y/
Z connector. The X axis cable will have 2 connectors with angle brackets.
The X1 axis has a 3 pin white connector for the X axis limit switch and a 2 pin
connector for a laser warning light.
21.
Locate the nuts with screws installed on the bottom of the right rail. Allow enough
room to comfortably attach the motor plug. X2 axis is shown. Note that the tie wrap
nib on the connector mount fits in the bottom channel with the plug parallel to the
extrusion.
22.
Verify AC Power off!
Attach the Y/Z cable and route cable. The Y/Z cable is the
same on both ends and it does not matter which end goes on the controller or the Y
axis. The spindle (router) power cord should run parallel with the Y/Z cord.
If you have the urge to tie up cables take precaution to leave plenty of room
for the cables to move full travel left to right and provide plenty of room to
flex. Leave a dip in the cable to provide a place for liquid to drip off before