Logano GE615 - We reserve the right to make any changes due to technical modifications.
2
Contents
1
General safety information and explanation
of symbols
3
1.1
For your safety
3
1.2
Explanation of symbols
3
2
Product Information
4
2.1
Product overview
4
2.2
Correct use
4
2.3
EU Declaration of Conformity
4
2.4
Specifications
5
2.5
Accessories
7
3
Regulations
8
3.1
Boiler room
8
3.2
Quality of heating water
8
3.3
Disposal and recycling
8
4
Installation
9
4.1
Checking delivery for completeness
9
4.1.1 Delivery as a pre-assembled block
9
4.1.2 Delivery in loose sections
9
4.2
Tools and auxiliary materials
10
4.3
Recommended wall clearances
10
4.3.1 Base and boiler plinth
11
4.4
Assembling the boiler block
12
4.4.1 Arrangement of boiler sections
12
4.4.2 Joining the boiler block assembly
13
4.5
Setting up the boiler block –
(when supplied as a pre-assembled block)
19
4.6
Inserting the feed pipe (parts case)
20
4.7
Sealing the sensor well (fittings case)
20
4.8
Inserting the outer steam tube (fittings case)
21
4.9
Boiler block pressure test (only when supplied
in loose sections)
22
4.9.1 Preparing for pressure test
22
4.9.2 Carry out a pressure test
22
4.9.3 Leaking hub joints
22
4.10
Boiler water connections
23
4.11
Installing fittings and burner door (delivery in loose
sections)
24
4.11.1 Positioning the flue gas header
24
4.11.2 Screwing clean-out cover onto rear section
24
4.11.3 Fitting the burner door
25
4.11.4 Inserting the hot gas baffles
25
4.12
Filling the heating system and checking for leaks 27
4.13
Installing the burner
29
4.14
Boiler flue connections
30
4.14.1 Fitting the flue pipe sealing collar (accessory)
30
4.14.2 Fitting the flue gas temperature sensor
(accessory)
30
4.15
Fitting the boiler casing
31
4.15.1 Fitting the insulation
31
4.15.2 Fitting the cross bars
32
4.15.3 Fitting side panels and hoods
35
4.16
Making an electrical connection
38
4.16.1 Fitting the control panel
38
4.16.2 Installing the temperature sensor set
40
5
Start up the heating system
41
5.1
Making the heating system operational
41
5.1.1 Creating operating pressure
(sealed heating systems)
42
5.1.2 Setting the capacity (open vented
heating systems)
42
5.2
Start up the control panel
42
5.3
Commission the burner
42
5.4
Commissioning report
43
5.5
Operating conditions for Buderus G and GE
cast iron boilers
44
5.6
Operating conditions GE 615
44
6
Shutting down the heating system
45
6.1
Standard shutdown
45
6.2
Emergency measures
45
7
Heating system inspection and
maintenance
46
7.1
Why is regular maintenance important?
46
7.2
Preparing the boiler for cleaning
46
7.3
Cleaning the boiler
47
7.3.1 Cleaning the boiler with cleaning brushes
47
7.3.2 Wet cleaning (chemical cleaning)
49
7.4
Checking the operating pressure
49
7.4.1 Checking the operating pressure
(sealed systems)
50
7.4.2 Checking the fill level (open systems)
50
7.6
Inspection and maintenance reports
53
8
Faults
56
Summary of Contents for Logano GE615
Page 60: ......