4
Installation
Logano GE615 - We reserve the right to make any changes due to technical modifications.
13
4.4.2
Joining the boiler block assembly
Preparation of boiler sections
z
Remove nuts and washers from the studs on the hubs
of the boiler sections before attaching the rear section
and front section.
V
Put the rear section in place and prevent from falling
over using the installation aid (
Æ
see Fig. 7 and sepa-
rate installation aid instructions).
z
File down any burrs on the hubs.
Fig 8
Deburring the hub
z
Clean the packing grooves where required using a wire
brush and cloth.
z
Clean the hub sealing faces with a rag soaked in white
spirit.
z
Evenly coat the hub sealing faces with red lead putty.
Fig 9
Coating the hub sealing faces
1
Upper hub sealing face
2
Lower hub sealing face
3
Packing groove
Caution: Risk of burning
through flammable solvents.
z
Observe the cleaning agent safety
instructions.
z
When using cleaning agents, avoid naked
flames, incandescence and sparks.
The next step involves preparing the nipples
that will eventually seal the boiler sections.
Summary of Contents for Logano GE615
Page 60: ......