4.6
Inserting the feed pipe (parts case)
On boilers with 9 – 11 sections the feed pipe is in 2
parts; on boilers with 12 – 16 sections, it comes in 3
parts.
z
Push the flat gasket over the feed pipe.
z
Push the feed pipe from the front into the upper boiler
hub.
z
Close off with dummy flange.
z
Place the lug on the feed pipe connection endplate into
the recess on the upper boiler hub.
Fig 21 Sealing in the feed pipe
1
Flat gasket
2
Dummy flange
3
Lug
4
Feed pipe
5
Recess in upper boiler hub
4.7
Sealing the sensor well (fittings
case)
Sensor well R ¾
"
z
Seal sensor well R ¾ " from the front (length 110 mm)
into the upper R ¾ " tapped hole in the flow
connection.
Sensor well R ½
"
z
Seal sensor well R ½ " ffrom the front (length 110 mm)
into the lower R ½ " tapped hole in the flow
connection.
Fig 22 Sealing the sensor wells
1
Sensor well R ¾ "
2
Sensor well R ½ "
Place the lug on the feed pipe connection
endplate into the recess on the upper boiler
hub so that the escape openings on the feed
pipe are positioned at the correct angle.