7
Heating system inspection and maintenance
Logano GE615 - We reserve the right to make any changes due to technical modifications.
55
As-required maintenance work
Page
Date:______
Date:______
Date:______
1.
Shutting down the heating system
44
2.
Remove and clean the hot gas baffles
47
3.
Clean the hot gas flues (heating surfaces)
48
4.
Clean the combustion chamber
48
5.
Clean the flue gas header
48
6.
Insert the hot gas baffles
25ff.
7.
Check gaskets/packing cords on the burner and burner
door and replace if required
48
8.
Start up the heating system
41
9.
Record the final checks of the maintenance work, incl.
measurements and test results
10.
Check functioning and safety in operation
Confirm the professional inspection
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Tab. 17 Maintenance report
Date:_____
Date:_____
Date:_____
Date:_____
Date:_____
Date:_____
Date:_____
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Tab. 18 Continuation
Summary of Contents for Logano GE615
Page 60: ......